Guides on NC6, DOW & ITC forms, SEAI grants, the Clean Export Guarantee, and compliance automation for Irish solar PV installers.
Everything Irish solar PV installers need to know about the NC6 Microgeneration Notification form — what it is, who submits it, required fields, common mistakes, and how to get it right first time.
Read more →A detailed guide to the SEAI Declaration of Works Part 1 form — required fields, dual signatures, pre-2021 property requirements, the 8-month submission window, BER requirements, and grant amounts for Irish solar PV installers.
Read more →A complete guide to the ITC Part 2 form for Irish solar PV installers — its relationship to EN 62446, required module and inverter fields, on-site vs STC measurements, DC test results, electrical certificates, and how to get it right.
Read more →Irish solar PV installers spend 45+ minutes per job filling NC6, DOW and ITC forms manually. This guide compares three approaches to automation and explains how Circaidian's AI extraction reduces it to seconds.
Read more →A step-by-step guide to the SEAI residential Solar PV grant process from the installer's point of view — from registration and homeowner eligibility through to grant payment, with the key rules and common bottlenecks at each stage.
Read more →A clear comparison of the NC6, NC7, and NC8 ESB Networks forms for Irish solar PV installers — capacity thresholds, the inverter kVA vs panel kWp distinction, and when each form applies.
Read more →How Circaidian reads Scoops post-installation reports (and those from OpenSolar, Pylon, and other platforms) to automatically generate compliant NC6, DOW, and ITC forms for Irish solar PV installers.
Read more →Everything Irish solar installers need to know about MPRN numbers — what they are, the correct format, where to find them, the homeowner name registration rule, common errors on NC6 and DOW forms, and the connection to the Clean Export Guarantee.
Read more →A comprehensive guide to the Clean Export Guarantee (CEG) in Ireland — what it is, prerequisites, the smart meter requirement, how tariff rates vary by supplier, the tax exemption, and what installers should explain to homeowners.
Read more →A practical guide to using electronic signatures on SEAI solar PV forms in Ireland — the eIDAS framework, simple vs advanced vs qualified signatures, SEAI's acceptance policy, audit trail requirements, and the homeowner signing experience.
Read more →Circaidian turns your Scoops post-installation report into three compliant forms — NC6 Microgeneration Notification, Declaration of Works Part 1, and Inspection, Test & Commissioning Part 2 — in seconds.
Try the Demo →